fix: doc: remove duplicate in hledger close docs

This commit is contained in:
Yehoshua Pesach Wallach 2023-03-12 12:19:49 +02:00 committed by Simon Michael
parent 8ea30463ed
commit 7ddcf3b9e1
2 changed files with 0 additions and 10 deletions

View File

@ -46,11 +46,6 @@ will be generated for each commodity.
With `--interleaved`, each equity posting is shown next to the With `--interleaved`, each equity posting is shown next to the
corresponding source/destination posting. corresponding source/destination posting.
The default closing date is yesterday or the journal's end date, whichever is later.
You can change this by specifying a [report end date](#report-start--end-date);
the last day of the report period will be the closing date.
Eg `-e 2022` means "close on 2022-12-31".
The default closing date is yesterday, or the journal's end date, whichever is later. The default closing date is yesterday, or the journal's end date, whichever is later.
You can change this by specifying a [report end date](#report-start--end-date); You can change this by specifying a [report end date](#report-start--end-date);
(The report start date does not matter.) (The report start date does not matter.)

View File

@ -42,11 +42,6 @@ each commodity.
With --interleaved, each equity posting is shown next to the With --interleaved, each equity posting is shown next to the
corresponding source/destination posting. corresponding source/destination posting.
The default closing date is yesterday or the journal's end date,
whichever is later. You can change this by specifying a report end date;
the last day of the report period will be the closing date. Eg -e 2022
means "close on 2022-12-31".
The default closing date is yesterday, or the journal's end date, The default closing date is yesterday, or the journal's end date,
whichever is later. You can change this by specifying a report end date; whichever is later. You can change this by specifying a report end date;
(The report start date does not matter.) The last day of the report (The report start date does not matter.) The last day of the report